Understand the numbers

What does this figure look like in practice?

Compare the scale of reported financial irregularities with familiar public programmes and infrastructure. These are illustrations—not a claim that every reported irregularity was cash lost or available to spend.

Live archive total · USD

$19,962,526,848

This nominal total is calculated from all available extracted reports in the archive. It will update as the underlying database changes.

Major programmes · 2025

2025 Big Push allocation

The approved 2025 allocation for priority infrastructure under the government's Big Push programme.

Approved allocationGH₵13.8bnMinistry of Finance

Converted at the archive's 2025 rate of GH₵11.10 per US dollar. An annual allocation is not the full multi-year programme cost.

Illustrative equivalent

16.1 times the 2025 Big Push allocation benchmarktimes

$19.96B ÷ $1.24B

Major programmes · 2020

Ghana Economic Transformation Project

A national project supporting private investment, entrepreneurship and growth in non-resource sectors.

Programme commitmentUS$200mWorld Bank

This is approved project financing, not a unit construction cost.

Illustrative equivalent

99.8 times the Ghana Economic Transformation Project benchmarktimes

$19.96B ÷ $200M

Hospitals · 2012

Greater Accra Regional Hospital redevelopment

The major redevelopment of Ridge Hospital into the Greater Accra Regional Hospital, including specialist facilities and equipment.

Reported project costUS$250mGhana News Agency

A tertiary regional hospital has a different scope, site and equipment profile from a standard district hospital.

Illustrative equivalent

79.9 times the Greater Accra Regional Hospital redevelopment benchmarktimes

$19.96B ÷ $250M

Hospitals · 2022

University of Ghana Medical Centre — Phase II

The second phase of the University of Ghana's quaternary medical centre, financed by a facility from Bank Hapoalim and commissioned in June 2022.

Programme commitmentUS$217mThe Custodian (Ghana)

This is a specialised teaching and research facility financed by a loan facility, not a representative cost for an ordinary hospital.

Illustrative equivalent

92 times the University of Ghana Medical Centre — Phase II benchmarktimes

$19.96B ÷ $217M

Roads · 2016

Pokuase Interchange and connecting roads

The interchange project and approximately 10 kilometres of interconnected urban roads in Greater Accra.

Reported project costUS$94.7mAfrican Development Bank

The total combines external financing and government counterpart funding; it should not be treated as a generic cost per kilometre.

Illustrative equivalent

210 times the Pokuase Interchange and connecting roads benchmarktimes

$19.96B ÷ $94.7M

Roads · 2026

One kilometre of rehabilitated rural road

An implied unit benchmark from US$500 million financing expected to rehabilitate and maintain more than 1,000 kilometres of rural roads.

Programme commitmentUS$500kWorld Bank

This is a simple financing-per-kilometre proxy. The programme also covers maintenance, market access and institutional activities, and actual road costs vary.

Illustrative equivalent

39,925 times the One kilometre of rehabilitated rural road benchmarktimes

$19.96B ÷ $500K

Schools · 2020

Six-unit basic-school classroom block

A six-classroom block at Esuoso with a computer room, toilets, urinal and landscaping.

Converted at the archive's 2020 rate of GH₵5.7602 per US dollar. Location, specification and construction inflation materially change school costs.

Illustrative equivalent

209,069 times the Six-unit basic-school classroom block benchmarktimes

$19.96B ÷ $95.48K

Schools · 2020

Ghana Accountability for Learning Outcomes Project

A nationwide programme supporting teaching and learning in low-performing basic schools.

Programme commitmentUS$219mMinistry of Finance

This is programme financing for learning outcomes, not the cost of constructing a school.

Illustrative equivalent

91.3 times the Ghana Accountability for Learning Outcomes Project benchmarktimes

$19.96B ÷ $218.7M

IMF comparisons · 2023

Ghana's 2023 IMF programme

The total approved amount under Ghana's three-year Extended Credit Facility arrangement.

Programme commitmentUS$3bnInternational Monetary Fund

The IMF amount is programme financing disbursed in tranches and subject to reviews; it is not a public-project cost.

Illustrative equivalent

6.65 times the Ghana's 2023 IMF programme benchmarktimes

$19.96B ÷ $3B

IMF comparisons · 2023

All IMF arrangements approved for Ghana since 1966

A historical comparison using the IMF's arrangement-level record, including the 2023 programme.

Programme commitmentUS$10.6bnIMF country lending history

This approximate nominal-dollar comparison sums approved arrangements across decades. It is not inflation-adjusted, and approved amounts are not the same as amounts ultimately drawn.

Illustrative equivalent

1.88 times the All IMF arrangements approved for Ghana since 1966 benchmarktimes

$19.96B ÷ $10.6B

IMF comparison

Ghana’s borrowing history, two ways.

Switch between the number of IMF borrowing approvals and the amounts Ghana actually drew. The count covers 17 formal arrangements and one 2020 outright emergency loan; periods group the IMF record for readability.

Borrowing approvals

18approvals

The live audit total is about $1.11B per approval.

Borrowing approvals by periodAs at 31 December 2023

Drawn amounts are published in SDR. For a like-for-like comparison with the archive’s USD total, this view uses the implied 2023 IMF programme conversion of SDR 2.2419bn ≈ US$3bn. It is a nominal conversion, not an inflation-adjusted historical value.

IMF history of lending commitments

Methodology

A scale comparison, not a spending claim.

Each equivalent divides the live US-dollar archive total by one published benchmark cost. Cedi benchmarks are converted using the documented rate for the benchmark’s source year—not today’s exchange rate.

Audit irregularities include several kinds of control failure and do not all represent confirmed theft or an immediately recoverable cash loss. Programme allocations, financing commitments, and reported project costs are also different kinds of figures; every row labels which one it uses.

Whole-build language is rounded down only when a whole number is shown. The calculation displayed under each result uses the unrounded values. Read the linked source and its caveat before citing a comparison.

Read the archive methodology · Inspect the underlying figures